Proyek Story

HORIZONTAL DIRECTIONAL DRILLING

HORIZONTAL DIRECTIONAL DRILLING     
NO NAMA PROJECT PANJANG BORING PEMBERI KERJA LOKASI PROJECT
1SKTT 150 KV GI DEPOK II - GI DEPOK III5.000 METERPT.PERSADA PRIYATNA DEPOK, JAWA BARAT
2SKTT 150 KV GI MAMPANG - HOTEL CROWN 5.000 METERPT.PERSADA PRIYATNA GATOT SUBROTO, JAKARTA
3SKTT GI 150 KV CSW - GI PONDOK INDAH 10.000 METERPT.PERSADA PRIYATNA MRT - DKI JAKARTA
4SKTT 150 KV GI DURI KOSAMBI - GI KEBON JERUK 5.000 METERPT.PERSADA PRIYATNA PURI KEMBANGAN, JAKARTA
5SKTT 150 KV GI SURALAYA 1 - GI SURALAYA 21.500 METERPT.PERSADA PRIYATNA SURALAYA, BANTEN
6SKTT 500 KV UNIT 8 SURALAYA- UNIT 7 SURALAYA 500 METERPT.PERSADA PRIYATNA SURALAYA, BANTEN
7SKTT 150 KV GI SURABAYA - GI SURAMADU 4.000 METERPT.PERSADA PRIYATNA SURABAYA, JAWA TIMUR
8SKTT 150 KV GI CIKUPA - GI CURUG 34.000 METERPT.PERSADA PRIYATNA TANGGERANG, BANTEN
9SKTT 150 KV GI CURUG - GI SUMARECON 8.000 METERPT.PERSADA PRIYATNA TANGGERANG, BANTEN
10SKTT 150 KV GI BANDARA - GI PECATU10.000 METERPT.PERSADA PRIYATNA DENPASAR, BALI
11SKTT 150 KV GI TANJUNG BUNGA - GI B0NTOALA10.000 METERPT.PERSADA PRIYATNA MAKASSAR, SULAWESI SELATAN
12SKTT 150 KV GI SARIO - GI TELING3.500 METERPT.PERSADA PRIYATNA MANADO, SULAWESI UTARA
13PEK 20 KV CROSING BUNDARAN PATUNG KUDA 500 METERPT.HDD MRT - DKI JAKARTA
14PEK 20 KV DISTRIBUSI SE KOTA DENPASAR5.000 METERPT.BONE DENPASAR, BALI



THRUST BORING

THRUST BORING    
NO NAMA PROJECT PANJANG BORING PEMBERI KERJA LOKASI PROJECT
1PEMASANGAN PIPA LIMBAH HDPE 300 MM30 METERPUPRTANGERANG, BANTEN
2PEMASANGAN PIPA BETON RCP 1.000 MM80 METERPT KARBEK NUSANTARATOL CIPALI PUWAKARTA
3PEMASANGAN PIPA BETON RCP 1.000 MM50 METERPT JASA MARGATOL JAKARTA - TANGGERANG
4PEMASANGAN PIPA LIMBAH PVC 400 MM310 METER PD.PALDKI JAKARTA
5PEMASANGAN PIPA LIMBAH PVC 400MM72 METER PD.PALDKI JAKARTA
6PEMASANGAN PIPA BETON RCP 600 MM280 METERPUPRMEDAN PROVINSI SUMATRA UTARA
7PEMASANGAN PIPA LIMBAH PVC 400 MM400 METERPD.PALDKI JAKARTA